• Accounting: manufacturing costs and product costing

What is underapplied overhead?

Written with AI (How we create content)Target level: Grade 12Last updated: Report an error
Quick answer

Underapplied overhead is the amount by which a factory's actual manufacturing overhead exceeds the overhead applied to its products at the predetermined rate. A factory that applied 7,500 machine hours × ₪30 = ₪225,000 but spent ₪246,000 has underapplied overhead of ₪21,000, usually added to cost of goods sold at the year end.

The topic explained

Applied is not the same as spent

During the year, a factory charges overhead to its products at a predetermined rate: each machine hour a table uses adds ₪30 of overhead to its cost. That applied overhead rests on a budget. Meanwhile the real overhead, rent, power, maintenance, is paid as the bills arrive. At the year end the two are compared, and they almost never match.

A made-up furniture factory set its rate from a budget of ₪240,000 and 8,000 machine hours. In fact its machines ran 7,500 hours, so it applied 7,500 × 30 = ₪225,000 to its products, and it spent ₪246,000. Its products carried ₪21,000 less overhead than the factory actually spent: that shortfall is underapplied overhead, also called under-absorbed. When applied overhead is the larger, the excess is overapplied overhead.

Manufacturing overhead T account: debit actual overhead ₪246,000; credit applied ₪225,000 (7,500 hours at ₪30); debit balance ₪21,000, underapplied.Manufacturing overheadDebitCreditActual overhead 246,000Applied 225,000246,000225,000Underapplied, debit 21,000
Actual on one side, applied on the other.

Why the gap opens

Two things can differ from the budget. The first is spending: the factory spent ₪246,000 instead of ₪240,000, ₪6,000 more. The second is activity: if the overhead is mostly fixed, the rate of ₪30 recovers the whole budget only if the machines run all 8,000 hours. They ran 500 hours fewer, so 500 × 30 = ₪15,000 of overhead was never charged to any product. Together, 6,000 + 15,000 = ₪21,000.

The split matters to managers. The spending part asks why the bills were higher; the activity part asks why the factory worked less than planned, perhaps because orders fell. Students often blame the whole gap on overspending, when here most of it came from idle machines.

Bar chart drawn to scale: actual overhead ₪246,000 and applied overhead ₪225,000; the gap is ₪21,000.₪246,000Actual₪225,000Applied
Products carried ₪21,000 less overhead than the factory spent.

Closing the gap

During the year, actual overhead is collected on the debit side of the Manufacturing overhead account and applied overhead on its credit side. At the year end the account has a debit balance of ₪21,000. The usual entry closes it to cost of goods sold: debit Cost of goods sold ₪21,000, credit Manufacturing overhead ₪21,000. Cost of goods sold rises and profit falls by ₪21,000, so the year carries all the overhead it really spent.

Overapplied overhead is closed the other way. Had the machines run 8,400 hours while spending was ₪238,000, the factory would have applied ₪252,000, ₪14,000 too much: debit Manufacturing overhead ₪14,000, credit Cost of goods sold ₪14,000. When the gap is large and many products are still in stock, it can instead be shared among work in process, finished goods and cost of goods sold.

Table of the causes: spending, ₪246,000 against the budget of ₪240,000, ₪6,000; activity, 500 fewer hours at ₪30, ₪15,000; underapplied ₪21,000 in all.CauseWorking₪Spending246,000 − 240,0006,000Activity500 hours × ₪3015,000Underapplied6,000 + 15,00021,000
The split assumes the factory's overhead is fixed for the year.

Reading the result

Overapplied does not simply mean good, nor underapplied bad. Overapplied overhead may come from busy machines, which is welcome, or from a budget that was too high, so that every product looked more expensive than it was and may have been overpriced. Underapplied overhead after a quiet year warns that the products were costed too low. The common mistake in exercises is to close underapplied overhead by crediting cost of goods sold: costs were too low, so cost of goods sold must go up.

Free printable worksheet

Practice: underapplied and overapplied overhead

For 12th grade accounting students. A print shop set its overhead rate from a budget of ₪180,000 and 9,000 labor hours. During the year it worked 9,600 labor hours and spent ₪183,000 on overhead. Its overhead is fixed for the year. Check the answers at the end.

Free, no sign-up. The answer key prints on the second page. Regenerating a new worksheet on the same topic needs a free account.

Free printable worksheetlessoons.com
Practice: underapplied and overapplied overheadName:
  1. What is underapplied overhead, and what is overapplied overhead?

  2. Find the predetermined rate and the overhead applied during the year.

  3. Complete the Manufacturing overhead account and say whether overhead is underapplied or overapplied.

    Manufacturing overhead T account of the print shop: debit actual overhead ₪183,000; credit applied with a question mark; the balance with a question mark.Manufacturing overheadDebitCreditActual overhead 183,000Applied ?Balance ?
  4. Explain the two causes of the gap.

    Table of the causes for the print shop, spending and activity, with the amounts and the overapplied total marked with question marks.CauseWorking₪Spending183,000 − 180,000?Activity600 hours × ₪20?Overapplied12,000 − 3,000?
  5. Complete the entry that closes the balance to cost of goods sold.

    Journal entry closing the print shop's overhead balance to cost of goods sold, with the accounts and amounts marked with question marks.AccountDebit ₪Credit ₪????
  6. What does the entry do to the year's profit, and why?

  7. A student closes the furniture factory's underapplied ₪21,000 with debit Manufacturing overhead, credit Cost of goods sold. What is wrong?

More topics and worksheets at lessoons.com© 2026 Lessons

Common questions

What is the difference between underapplied and overapplied overhead?

Underapplied overhead means actual overhead was more than the overhead applied to products; overapplied means the overhead applied was more than the actual overhead. Both are measured at the year end.

Why does underapplied overhead happen?

Because the rate rests on a budget. Spending can be higher than budgeted, or the factory can work fewer hours than planned, so that the rate recovers less than the overhead that was spent.

How is underapplied overhead closed?

Usually by debiting cost of goods sold and crediting the manufacturing overhead account. When the amount is large, it can be shared among work in process, finished goods and cost of goods sold.

Does underapplied overhead reduce profit?

Yes. Closing it adds the missing overhead to cost of goods sold, which lowers the year's profit to what it would have been had products carried the overhead actually spent.

Is overapplied overhead a good sign?

Not necessarily. It may come from more activity than planned, which is welcome, or from a budget set too high, which made every product look more expensive than it was.

Still have a question? Ask Lessi

Any question about this subject. Lessi answers right here, step by step.

Try asking

Asking needs a free account; your question is kept while you sign up. Answers are written by AI and can contain mistakes. Lessi doesn’t give medical or legal advice.

Learn it with a teacher

Learn this topic live with Lessi

Lessi, the AI teacher, explains it out loud on a board, with short quizzes, at your pace. The first 60 minutes are free.