• Accounting: manufacturing costs and product costing

How do you calculate a predetermined overhead rate?

Written with AI (How we create content)Target level: Grade 12Last updated: Report an error
Quick answer

To calculate a predetermined overhead rate, divide the manufacturing overhead budgeted for the year by the budgeted amount of an allocation base, such as machine hours. A factory that budgets ₪240,000 of overhead and 8,000 machine hours has a rate of ₪30 per machine hour, and a table that uses 3 machine hours carries ₪90 of overhead.

The topic explained

A cost no product owns

Materials and direct labor can be traced to each product: this table used ₪400 of wood and five hours of a carpenter's time. Manufacturing overhead cannot. The factory's rent, the depreciation of its machines, the supervisor's salary and the electricity serve every product at once. To know what a product costs, the factory has to give each product a fair share of the overhead, and it does so with a predetermined overhead rate.

The rate is a price per unit of an allocation base, something every product uses and that moves with the overhead: machine hours, direct labor hours or, for identical products, units. A made-up furniture factory budgets overhead of ₪240,000 for the year and expects its machines to run 8,000 hours. Its rate is 240,000 ÷ 8,000 = ₪30 per machine hour.

Flow: budgeted overhead ₪240,000 for the year, divided by the base, 8,000 machine hours, gives the rate, ₪30 per machine hour.₪240,000Budgeted8,000 hoursDivided by base₪30 an hourThe rate
Set before the year begins, from the budget.

Choosing the base

The same overhead gives different rates on different bases. The factory also expects 12,000 direct labor hours, so on labor hours the rate would be 240,000 ÷ 12,000 = ₪20 per hour. A dining table that uses 3 machine hours and 5 labor hours would carry ₪90 of overhead on the first base and ₪100 on the second.

The right base is the one that best explains why the overhead arises. In a factory full of machines, where depreciation, power and maintenance make up most of the overhead, machine hours are the better choice; in a workshop where most work is done by hand, labor hours are. A base that has nothing to do with the overhead, such as the selling price, spreads cost arbitrarily and misleads the managers who set prices.

Table of two bases: machine hours, rate ₪30, ₪90 for a table using 3 machine hours, suits a factory where machines drive cost; labor hours, rate ₪20, ₪100 for a table using 5 labor hours, suits work done by hand.BaseRatePer tableSuits whenMachine hours₪30₪90Machines drive costLabor hours₪20₪100Work is by hand
The same overhead, spread two ways.

Applying overhead to a product

With the rate set, each product's cost is built from what it uses. The dining table: direct materials ₪400; direct labor 5 hours at ₪60, ₪300; overhead 3 machine hours at ₪30, ₪90. Its cost is ₪790. This applied overhead is what the cost card, the inventory and, when the table is sold, the cost of goods sold carry.

Why use a rate fixed in advance, and not the actual overhead? Because the actual figure is known only at the end of the year, while prices are quoted and stock is valued every month. Monthly actual rates would also swing: heating in winter, a slow month in summer. A rate set once, at the factory's normal level of activity, gives the same table the same cost in January and in July.

Cost card of a dining table: direct materials ₪400, direct labor 5 hours at ₪60, ₪300, overhead 3 machine hours at ₪30, ₪90, total cost ₪790.Cost card₪Direct materials400Direct labor, 5 h × ₪60300Overhead, 3 machine h × ₪3090Cost of the table790
Overhead joins the product at the rate, hour by hour.

When the budget is wrong

Because the rate rests on a budget, the overhead applied during the year will rarely equal the overhead actually spent. If the factory spends ₪250,000, or its machines run 7,500 hours instead of 8,000, a gap opens between applied and actual overhead. That gap, called under-absorbed or over-absorbed overhead, is dealt with at the year end, in the last lesson of this course. A common mistake in exercises is to compute the rate from actual figures when the question asks for the predetermined one: read which numbers are budgeted.

Free printable worksheet

Practice: the predetermined overhead rate

For 12th grade accounting students. A print shop budgets overhead of ₪180,000 for the year, with 9,000 direct labor hours and 6,000 machine hours. A job uses ₪250 of materials, 4 labor hours at ₪50 an hour and 2 machine hours. Check the answers at the end.

Free, no sign-up. The answer key prints on the second page. Regenerating a new worksheet on the same topic needs a free account.

Free printable worksheetlessoons.com
Practice: the predetermined overhead rateName:
  1. Why can overhead not be traced to each product like materials?

  2. Calculate the predetermined overhead rate on labor hours.

    Flow for the print shop: budgeted overhead ₪180,000 divided by 9,000 labor hours, with the rate marked with a question mark.₪180,000Budgeted9,000 hoursDivided by base?The rate
  3. Calculate the rate on machine hours and the overhead the job carries on each base.

  4. Complete the job's cost card, applying overhead on labor hours.

    Cost card of the print job: direct materials ₪250, direct labor 4 hours at ₪50, overhead 4 labor hours at the rate, and the total, with labor, overhead and total marked with question marks.Cost card₪Direct materials250Direct labor, 4 h × ₪50?Overhead, 4 labor h × rate?Cost of the job?
  5. The print shop's overhead is mostly the depreciation and power of its presses. Which base suits it better? Why?

  6. A manager suggests a rate from each month's actual figures. Complete the table and explain the problem.

    Table of two months: January overhead ₪18,000 over 600 hours and July ₪13,500 over 900 hours, with each month's rate and the overhead on a 5-hour job marked with question marks.MonthOverhead ₪HoursRate5-hour jobJanuary18,000600??July13,500900??
  7. A student calculates the rate as ₪180,000 divided by the number of jobs done last year. What is wrong?

More topics and worksheets at lessoons.com© 2026 Lessons

Common questions

What is a predetermined overhead rate?

A rate set before the year begins that spreads manufacturing overhead over products: the budgeted overhead divided by the budgeted amount of an allocation base, such as machine hours or labor hours.

What is an allocation base?

A measure that every product uses and that moves with the overhead, such as machine hours, direct labor hours or units produced. Overhead is applied to each product according to how much of the base it uses.

Why not use the actual overhead?

Because it is known only at the end of the year and changes from month to month. Costs and prices are needed all year, so a rate based on the budget and the normal level of activity is used instead.

Can a factory use more than one rate?

Yes. Many factories set a separate rate for each department, for example machine hours in the machining department and labor hours in assembly, which gives a more accurate cost per product.

What happens if the budget turns out wrong?

The overhead applied will differ from the overhead actually spent. The difference, under-absorbed or over-absorbed overhead, is closed at the year end, usually to the cost of goods sold.

Still have a question? Ask Lessi

Any question about this subject. Lessi answers right here, step by step.

Try asking

Asking needs a free account; your question is kept while you sign up. Answers are written by AI and can contain mistakes. Lessi doesn’t give medical or legal advice.

Learn it with a teacher

Learn this topic live with Lessi

Lessi, the AI teacher, explains it out loud on a board, with short quizzes, at your pace. The first 60 minutes are free.