# What is job order costing?

> Written with AI · [Accounting: manufacturing costs and product costing](https://lessoons.com/en/manufacturing-cost-accounting) · Grade 12 · 2026-11-13 · https://lessoons.com/en/manufacturing-cost-accounting/what-is-job-order-costing

Job order costing finds the cost of each order separately, on its own cost card: the direct materials taken for the job, the hours worked on it times the wage, and overhead applied at the predetermined rate. A carpenter's kitchen with ₪18,000 of materials, 60 hours at ₪80 and overhead of ₪50 an hour costs ₪25,800.

## The topic explained

### One order, one card

A carpentry shop never makes the same kitchen twice: one client wants oak and twelve drawers, the next pine and an island. Each order uses different materials and different hours, so each needs its own cost. Job order costing gives every order a job cost card and collects on it every cost of that job, and only of that job.

Three kinds of cost go on the card. Direct materials, recorded as they are taken from the store for the job. Direct labor, the hours each worker records against the job times the wage. And overhead, which cannot be traced, applied at the predetermined overhead rate for each hour the job uses. A made-up shop's kitchen, job K-17, used ₪18,000 of materials and 60 labor hours at ₪80, ₪4,800; at an overhead rate of ₪50 per labor hour it carries ₪3,000 of overhead. Its cost is ₪25,800.

### Profit and price, job by job

The client pays ₪33,000 for job K-17, so its gross profit is 33,000 − 25,800 = ₪7,200, about 21.8% of the price. The card shows at once which jobs pay well and which do not, something a total for the whole year would hide.

The same card helps to quote a price before the work begins. If the shop wants a gross margin of 25% of the price, cost must be 75% of it: price = 25,800 ÷ 0.75 = ₪34,400. A common mistake is to add 25% to the cost, 25,800 × 1.25 = ₪32,250, which gives a margin on price of only 20%.

### Where the cost sits at the month end

At any month end the shop's jobs are at different stages, and the cards say where each one's cost belongs. Job K-17 was delivered: its ₪25,800 is cost of goods sold. Job K-18 is finished and waiting in the store: its ₪14,200 is finished goods. Job K-19 is half built: the ₪6,500 on its card so far is work in process. The work in process in the balance sheet is simply the total of the cards of unfinished jobs.

Forgetting the overhead on the card is the most expensive mistake: a kitchen costed at ₪22,800, materials and labor only, looks more profitable than it is, and a shop that prices every job that way may sell all year and still not cover its rent.

At the year end the cards are also checked against the overhead actually spent. Because overhead was applied at a rate fixed in advance, the total on the cards rarely equals the real overhead; the difference is closed at the year end, as the last lesson of the course shows.

### Job costing or process costing?

Job costing suits businesses whose products are different from one another: furniture to order, printing, building, car repairs, and services such as accounting or law, where the job is a client's file. Where identical products flow in a stream, a dairy filling cartons or a cement works, there are no separate jobs to card. Those businesses use process costing: they collect costs for each department and divide by the units produced, the next lesson.

## Practice: job order costing

For 12th grade accounting students. A garage repairs a car using ₪1,200 of parts and 5 labor hours; mechanics are paid ₪100 an hour and overhead is applied at ₪60 per labor hour. The customer pays ₪2,600. Check the answers at the end.

1. **Name two businesses that use job order costing and say why.** — For example a garage and a print shop: each job is different, so each needs its own cost. Building firms, carpenters and accountants' offices are other examples.
2. **Complete the garage's job cost card.** — Labor 5 × 100 = ₪500; overhead 5 × 60 = ₪300; cost 1,200 + 500 + 300 = ₪2,000.
3. **Find the gross profit on the repair and its percentage of the price.** — 2,600 − 2,000 = ₪600, about 23.1% of the price.
4. **What price gives the garage a gross margin of 20% of the price on this repair?** — Cost must be 80% of the price: 2,000 ÷ 0.8 = ₪2,500.
5. **At the month end, say where the cost of each job sits.** — G-1, delivered: cost of goods sold ₪2,000. G-2, finished but not collected: finished goods ₪3,400. G-3, still in work: work in process ₪900.
6. **Would each business use job costing or process costing?** — Wedding photographer: job. Soft-drink bottling plant: process. Firm that builds houses: job. Flour mill: process.
7. **A mechanic prices the repair at cost plus 20% but costs it at parts and labor only, ₪1,700. What is the price, and what goes wrong?** — 1,700 × 1.2 = ₪2,040. The real cost is ₪2,000 with overhead, so the profit is only ₪40. Leaving overhead off the card hides the costs of the garage itself, its rent, tools and electricity.

## Common questions

### What is a job cost card?

The record of one job or order. It collects the direct materials taken for the job, the labor hours worked on it and the overhead applied at the predetermined rate, and its total is the cost of the job.

### Which businesses use job order costing?

Businesses whose products or services differ from one order to the next: carpenters, print shops, builders, garages, shipyards, and service firms such as accountants, lawyers and consultants.

### How is overhead included in job costing?

With a predetermined overhead rate: for each hour, or other unit of the base, that the job uses, it is charged the rate. The actual overhead is compared with the applied overhead at the year end.

### What is the difference between job costing and process costing?

Job costing finds the cost of each separate order. Process costing finds an average cost per unit for identical products made in a continuous stream, by dividing a department's costs by the units produced.

### How is work in process valued in job costing?

It is the total of the costs recorded so far on the cards of all the jobs not yet finished at the date of the balance sheet.